When it is not possible to dig a pit, are there any other solutions?
In cases where digging is not possible (sizes are generally between 50 and 90 cm) there are models with an extremely small pit (20 cm) which can be replaced by a platform access ramp. This access ramp can be made of concrete, metalwork or aluminium.